Not for distribution to U.S. newswire services or for dissemination in the United States
TORONTO, Nov. 08, 2021 (GLOBE NEWSWIRE) -- Giyani Metals Corp. (TSXV:EMM, GR:A2DUU8) ("Giyani" or the "Company " ), developer of the K.Hill manganese oxide project (the “K.Hill Project”) in Botswana, is pleased to announce an update on its operational and commercial activities.
Highlights
Metallurgical testwork up to the stock solution stage completed and a specialist engineering firm engaged to undertake the crystallisation testwork to finalise the process flowsheet for the feasibility study (“FS”) on the K.Hill Project and construction of the demonstration plant.
26 of the planned 56 reverse circulation (“RC”) drill holes completed at the Otse manganese oxide prospect (“Otse”). Initial results show high grade mineralisation in multiple holes with intersections in excess of 60% manganese oxide (“MnO”).
Data and sample-sharing agreements signed with several major European original equipment manufacturers (“OEMs”) and cathode producers.
Giyani welcomed into membership of the European Battery Alliance EBA250 network.
K.Hill Project Metallurgical Testwork
Optimised metallurgical test work and final process flowsheet design, as part of the FS on the K.Hill Project, has been completed by Mintek in South Africa. This phase of the testwork does not include crystallisation. A specialist engineering firm has been engaged to undertake crystallisation testwork with a view to finalising the...
Read Full Story: https://finance.yahoo.com/news/giyani-announces-activities-manganese-projects-125900016.html
Your content is great. However, if any of the content contained herein violates any rights of yours, including those of copyright, please contact us immediately by e-mail at media[@]kissrpr.com.