×
Saturday, November 23, 2024

Corporate and Project Update on the Emily Manganese Project - InvestingNews.com

Last updated Tuesday, December 21, 2021 10:35 ET , Source: NewsService

NOT FOR DISSEMINATION IN THE UNITED STATES OR THROUGH U.S. NEWS WIRESNevada Silver Corporation is pleased to provide an update on its 100% owned subsidiary North State Manganese Inc and the Emily Manganese Project . Emily is in the Cuyuna Iron Range, Crow Wing County, Minnesota and was the subject of a June 2020 NI 43-101 mineral resource estimate by Barr Engineering Company 1TABLE 1: NI 43-101 COMPLIANT INDICATED ...

NOT FOR DISSEMINATION IN THE UNITED STATES OR THROUGH U.S. NEWS WIRES

Nevada Silver Corporation ("NSC" or the "Company") (TSXV:NSC) is pleased to provide an update on its 100% owned subsidiary North State Manganese Inc ("North Star") and the Emily Manganese Project ("Emily"). Emily is in the Cuyuna Iron Range, Crow Wing County, Minnesota and was the subject of a June 2020 NI 43-101 mineral resource estimate by Barr Engineering Company (Table 1)1

TABLE 1: NI 43-101 COMPLIANT INDICATED AND INFERRED MINERAL RESOURCE ESTIMATE

Review of NI 43-101 resource drill data highlights high-grade intersections

North Star recently commissioned a review of drilling and other technical data contained within the Barr Engineering mineral resource estimate. A number of high-grade drill intersections were identified within thicker zones of mineralization2, including:

  • Drill hole VC-01-11: 33.68 meters from 70.56 meters @ 16.93% Mn
    • Including 8.99 meters @ 34.58% Mn; and
    • Including 1.07 meters @ 50.10% Mn
  • Drill hole AC-01-11: 36.88 meters from 135.02 meters @ 9.98% Mn
    • Including...


Read Full Story: https://investingnews.com/corporate-and-project-update-on-the-emily-manganese-project/

Your content is great. However, if any of the content contained herein violates any rights of yours, including those of copyright, please contact us immediately by e-mail at media[@]kissrpr.com.