SHANGHAI, Dec 28 (SMM) – Eastern Steel Sdn Bhd commenced construction of its 240,000 mt/year silico-manganese alloy project in Malaysia. The project is constructed in two phases.
In the first phase, a workshop, two 33 MVA fully enclosed manganese-silicon alloy RKEFs will be built, which is equipped with a 36 m2 sintering machine, a raw material yard and other public and auxiliary facilities.
The project is expected to be completed and put into production in September 2022.
For queries, please contact Frank LIU at [email protected]
For more information on how to access our research reports, please email service.en@smm.
Read Full Story: https://news.metal.com/newscontent/101707208/Eastern-Steel-Commenced-Construction-of-240000-mtyear-Silico-Manganese-Alloy-Project-in-Malaysia/
Your content is great. However, if any of the content contained herein violates any rights of yours, including those of copyright, please contact us immediately by e-mail at media[@]kissrpr.com.